Code-first design
Every member checked against current IS provisions — load paths documented, not assumed.
Structural design, analysis, audits and retrofitting for masjids, homes and infrastructure across Kerala — sized for safety, optimised for cost, detailed so the site team never has to guess.
A structure should be as efficient as it is safe. Every frame we design is analysed, optimised and detailed so it stands up to code, to site reality, and to your budget.
We work directly with architects, contractors and building committees — resolving structure early, so nothing has to be rebuilt later. From a prayer hall that needs to stay column-free, to a hillside retaining wall, to an existing column that has quietly lost its capacity.
More about the practiceEvery member checked against current IS provisions — load paths documented, not assumed.
We size for performance, not habit. Leaner sections and honest rebar mean real savings on site.
Drawings a bar bender can read. Clear schedules, clean junctions, fewer questions mid-pour.
Third-party proof checking and structural audits when you need an unbiased second opinion.
Six disciplines covering a structure's whole life — from the first analysis model to the assessment that keeps it standing decades later.
RCC and steel framing designed and modelled for gravity, wind and seismic demand — then optimised before a single drawing is issued.
ExploreCondition surveys and capacity checks on existing buildings, backed by NDT data and clear, defensible reporting.
ExploreJacketing, FRP wrapping and seismic strengthening that restore capacity and extend service life.
Independent verification of third-party designs before approval or tender.
GFC drawing sets, bar bending schedules and clash-checked models.
Stage-wise inspection, method statement review and on-call resolution of structural queries — so small on-site improvisations never become expensive problems.
ExploreA two-storey masjid at Perinthalmanna carrying a latticed central dome, arched openings across both floors and a detached brick minaret — with the frame set out so the prayer hall stays clear of intermediate columns.
A defined sequence from brief to handover, so you always know what has been checked and what comes next.
We review architectural intent, soil data and constraints, then advise on the most viable structural system.
The frame is modelled and loaded for gravity, wind and seismic cases, then checked against governing codes.
Members are sized and iterated — balancing safety factors against material and formwork cost.
GFC drawings, schedules and calculation reports are issued and walked through with your team.
We stay available through construction — inspecting key stages and resolving queries before they cause delays.
They questioned our column grid on day one and saved us a transfer beam we had already budgeted for. That one conversation paid their fee twice over.
The drawings arrived complete — bar bending schedules, sections, everything. Our bar benders had almost no questions, which never happens.
We needed an assessment before adding a floor. They were honest about what the existing frame could take, and gave us a clear path forward.
Note: replace these with real client testimonials, or remove the section.
Large consultancies hand your project to whoever happens to be free. Here, the engineer who signs the drawing is the engineer who answers your call from site.
On most projects, the steel and concrete we save through proper optimisation exceeds our own fee.
Clear detailing and complete schedules mean fewer questions, fewer stoppages and less rework.
Every design is backed by a calculation report — ready for approval authorities, lenders or insurers.
Share your plans and site details and we will come back with a scope, a timeline and a fixed fee, usually within a working day.